Level 2 EV Charging

Reliable AC charging wherever cars park for hours

Level 3 DC Fast Charging

High-power charging, built from the utility to the plug

EV Infrastructure

Utility service, switchgear, trenching and site work — the power behind every charger

Solar Carports

Shade, generate and charge — in one structure

Battery Storage & Power Banks

More chargers, less utility wait, lower demand charges

Multifamily & Fleet Charging

Scalable charging for residents, HOAs and depots

Level 2Ampaway Dual-Port Wall ChargerTwo connectors · RFID access · NetworkedSingle-Port Wall MountGarages, homes & workplacesPedestal ChargerSurface lots & curbside parkingMulti-Unit Garage RolloutLoad-managed circuits for many stallsView Level 2 EV Charging →
DC FastAmpaway High-Power DispenserUp to 400 kW · CCS1 + NACSAmpaway DC WallboxCompact wall-mount DC · Dual connectorDual-Cable DC Fast ChargerTouchscreen · Tap to payDC Fast Charging HubMulti-stall sites with canopyView Level 3 DC Fast Charging →
InfrastructureSwitchgear & MeteringService equipment, meters & disconnectsTrenching & ConduitBoring, trenching & underground runsEquipment Pads & CabinetsConcrete pads, cabinets & settingBollards & Site ProtectionCore drilling, bollards & wheel stopsView EV Infrastructure →
Solar CarportsT-Frame Solar CanopySingle-column canopy over two rowsRooftop Garage CarportTop-deck canopies with chargersCanopy + Charging HubIntegrated cabinets & dispensersGround-Mount SolarFixed-tilt arrays beside your siteView Solar Carports →
Energy StorageContainerized Battery (BESS)Peak shaving & backup for charging sitesBattery-Buffered ChargingFast charging on limited grid serviceSolar + Storage + ChargingGenerate, store and deliver on siteView Battery Storage & Power Banks →
Multifamily & FleetApartment Garage ChargingAssigned & shared resident stallsCorridor & Wall InstallsClean conduit runs in occupied buildingsFleet Depot ChargingOvernight & opportunity chargingView Multifamily & Fleet Charging →
Cost EstimatorContractor LoginBecome a ContractorContactGet a Quote(888) 490-0090

EV Charging Infrastructure

Level 2 · DC Fast Charging · Infrastructure · Solar Carports · Energy Storage

Cost estimator

What will it cost to install?

Planning ranges for the Los Angeles area, built from 2026 installed-cost data and our own project history. Pick the project, set the size, and see where the money goes before any incentives come off.

charging ports
kWh
spaces (about 6 kW of solar each)
Planning range · before incentives
After typical incentives

    Turnkey EV infrastructure

    From the transformer to the plug.

    One team handles every layer of your charging project — engineering, permits, utility, civil, electrical, structures, chargers and service.

    01

    Site Assessment & Load Studies

    Walk the site, review utility bills and panel capacity, and map the power you have — and need.

    02

    Electrical Design & Engineering

    Plans, single-line diagrams, load calculations and charger layouts built for today and expansion.

    03

    Permitting & Utility Coordination

    We manage the permit path and the utility service request — the two biggest schedule risks.

    04

    Transformers & Switchgear

    Pad-mounted transformers, switchboards and distribution for high-power sites.

    05

    Trenching, Boring & Conduit

    Civil work, directional boring, conduit runs, equipment pads and restoration.

    06

    Charger Installation

    Level 2 and DC fast chargers set, wired, networked and commissioned.

    07

    Solar Carport Structures

    Steel canopies with integrated solar and charger mounting.

    08

    Battery Storage

    Storage to cut demand charges and add chargers on limited service.

    09

    Maintenance & Uptime

    Preventive maintenance, diagnostics, repairs and warranty coordination.

    How it works

    Six steps. Zero guesswork.

    Assess

    Site walk, power review and goals.

    Design

    Engineering, layout and equipment.

    Permit

    Permits and utility requests.

    Build

    Electrical, civil, structures, chargers.

    Commission

    Testing, networking, activation.

    Maintain

    Monitoring and uptime support.

    Recent installs

    Clean installs. Built to code.

    Level 2 charging in occupied parking garages — dedicated circuits, EMT conduit runs, protective cord trays and wheel stops.

    Level 2 · Parking garage
    Level 2 · Parking garage
    Level 2 · Wall-mount with cord tray
    Level 2 · Wall-mount with cord tray
    Level 2 · Surface conduit run
    Level 2 · Surface conduit run
    Level 2 · Corridor install
    Level 2 · Corridor install

    No cost · No obligation

    Get a Free Site Assessment

    Tell us about your property and charging goals. We’ll review power, equipment options, incentives and timeline — no cost, no obligation.

    Prefer to talk? (888) 490-0090

    It is printed at the top of your electric bill. This decides which rebates apply.
    A best guess is fine.
    Lets us check your utility territory, disadvantaged-community status and permit jurisdiction before we call.
    Drag & Drop Files, Choose Files to Upload, or Capture With Your Camera You can upload up to 20 files.
    Upload a photo (or a few photos) of the parking spots where you'd like the chargers installed. Up to 20 images.